Oil & Gas Processing Equipment

BPE oil and gas processing equipment line cover surface production equipment from wellhead to pipe line as well as offshore facilities.
Our principal solutions are:
- Vertical/Horizontal 2and 3 phase separators
- Dehydration / Regeneration Units
- Hydrogen Sulphide Mercaptans & CO2 removal
- Flare or Vent Scrubbers
- Fuel Gas Systems
- Free Water Knock Outs (FWKO)
- Gas/Glycol Contractor Tower:-
- Random Packing
- Bubble Cap Trays
- Structured Packing
- Code Construction:-
- Vessels – ASME Section VIII, Division 1, “U” stamp
- Vessels Repairs – National Board “R” Stamp
- Piping – ANSI B31-3
- ACAD Drawing capability
Downloads
FMC CDS input data sheet (PDF, 22KB)
For more information, or to place an order, please fax a printed copy of the appropriate form to (868) 646-8957.
Contact BPE today for more information.

Advanced Gel Technology